解决方案

飞剪电控系统

飞剪工艺流程:

钢卷由行车从钢卷库吊到钢卷备料台上,然后由钢卷小车送到开卷机卷筒上,卷筒涨开使钢卷固定在卷筒上,拆掉捆带,借助开卷机,将带头引入夹送装置中,输送到矫直机装置整平后,送入定尺装置,定尺、追料连续剪切(回转式),剪切后的板材由皮带输送机送到一号或二号堆垛机堆垛,然后打包、称重、入库等待发运。


具体流程如下:

上料→ 开卷→ 切废料→ 矫直→ 剪切→ 输送→ 码垛→ 打包。


Process of flying shear

Coil is hung from coilw arehouse to coilpreparati on stage by the bridge crane, and then it is sent to the uncoiler reel by the coilcar. The reel opens so that the coil is fixed on the roll . The strap is removed. Utilizing the unwinding device, the lead is introduced into the leveler leveling device and then the length device for length determ ination and continuous shear ( rotary) . The sheet metal after been sheared are transported to the stacker I or II by the be It conveyor, and then for packing, weighing, storage, and shipment.


The specific procedures are as follows

Feeding →uncoiling →waste shearing →straighteni ng→ shearing → transporting →stacking → packing